Basic
$756 – $2,836 per project
Mini excavator strips sod and topsoil to depth over the pad footprint, spoils spread on site, rough leveled
Typical small residential excavation job (e.g. site prep for a shed pad, patio, or small addition), equipment and operator.
Excavate Land in Anchorage, Alaska typically costs $890 to $3,336 per project as of 2026. Prices reflect local labor and material rates. Use our calculator below for a detailed, ZIP-code-adjusted estimate.
Prices in Anchorage are 13.0% higher than the national average for excavate land.
National average: $800 – $3,000 per project
$756 – $2,836 per project
Mini excavator strips sod and topsoil to depth over the pad footprint, spoils spread on site, rough leveled
$890 – $3,336 per project
Mini excavator cuts the pad to depth, levels and compacts the subgrade, spoils spread on site
$1,112 – $4,170 per project
Pad cut to depth with laser-level grading and slight drainage slope, plate-compacted subgrade, spoils spread on site
| Component | Category | Price Range | Unit |
|---|---|---|---|
| Materials | material | $385 – $1,445 | job |
| Labor | labor | $333 – $1,250 | job |
| Supplies & Other | supplies | $103 – $385 | job |
| Equipment & Disposal | equipment | $68 – $257 | job |
Labor costs in Anchorage run proportionally higher than materials, which may favor material-heavy solutions.
Connect with local excavate land contractors in Anchorage for personalized quotes based on your specific project.