Basic
$25 – $62 each
Excavated soil returned around the post and hand-tamped, excess soil spread nearby
Backfill and hand-compact soil around one post hole as part of a fence or post job.
Backfill Post Hole in Arlington, Texas typically costs $29 to $73 each as of 2026. Prices reflect local labor and material rates. Use our calculator below for a detailed, ZIP-code-adjusted estimate.
Prices in Arlington are 5.0% lower than the national average for backfill post hole.
National average: $30 – $75 each
$25 – $62 each
Excavated soil returned around the post and hand-tamped, excess soil spread nearby
$29 – $73 each
Soil returned in 4 to 6 in. lifts, each hand-tamped firm, top crowned to shed water
$36 – $91 each
Gravel at hole bottom for drainage, soil in thin tamped lifts, top crowned away from post, excess removed
| Component | Category | Price Range | Unit |
|---|---|---|---|
| Materials | material | $13 – $35 | each |
| Labor | labor | $9.46 – $22 | each |
| Supplies & Other | supplies | $3.71 – $9.27 | each |
| Equipment & Disposal | equipment | $2.47 – $6.18 | each |
Material costs in Arlington run proportionally higher than labor, which may favor labor-intensive approaches.
Connect with local backfill post hole contractors in Arlington for personalized quotes based on your specific project.