How Much Does Install GFCI Outlet Cost in Arlington, Texas?

Supply and install one GFCI receptacle in an existing box or as a new outlet on a nearby circuit.

Install GFCI Outlet in Arlington, Texas typically costs $126 to $340 each as of 2026. Prices reflect local labor and material rates. Use our calculator below for a detailed, ZIP-code-adjusted estimate.

Install GFCI Outlet in Arlington, Texas

$126 – $340

each

Prices in Arlington are 5.0% lower than the national average for install gfci outlet.

National average: $130 – $350 each

What you get at each price level

  • Basic

    $107 – $289 each

    15A tamper-resistant self-test GFCI receptacle matched to the circuit, white, standard plastic wall plate, wired and tested

  • Standard

    $126 – $340 each

    15A tamper-resistant self-test GFCI matched to the circuit, with status light and a screwless decorator plate, wired and tested

  • Premium

    $158 – $425 each

    Tamper-resistant self-test GFCI with status light and audible alarm, color-matched screwless plate, box connections tightened and tested

Cost Breakdown in Arlington

ComponentCategoryPrice RangeUnit
Materialsmaterial$60 – $163each
Laborlabor$40 – $105each
Supplies & Othersupplies$16 – $43each
Equipment & Disposalequipment$10 – $29each
Prices adjusted for Arlington local market conditions.

Install GFCI Outlet photo examples

Cost Factors in Arlington, Texas

What Affects Pricing

  • Materials ($58.00-$158.00 per unit)
  • Labor ($46.00-$122.00 per unit)
  • Supplies & Other ($16.00-$42.00 per unit)
  • Equipment & Disposal ($10.00-$28.00 per unit)

Local Price Adjustments

Material costs3.0% above avg
Labor costs14.0% below avg

Material costs in Arlington run proportionally higher than labor, which may favor labor-intensive approaches.

Frequently Asked Questions

References

Get Free Estimates in Arlington

Connect with local install gfci outlet contractors in Arlington for personalized quotes based on your specific project.

More Cost Intelligence for Arlington