Skip to main content
BuildX Pro
Rendering: Pegboard at the Premium level: Powder-coated steel pegboard panels on spacers into studs, higher load capacity, finished edges

Rendering: BuildX

How Much Does Pegboard Cost in Arlington, Texas?

Supply and mount hardboard or metal pegboard panels on furring strips/spacers into studs on a garage or workshop wall.

Pegboard in Arlington, Texas typically costs $2.91 to $9.71 per sq ft as of 2026. Prices reflect local labor and material rates. Use our calculator below for a detailed, ZIP-code-adjusted estimate.

Pegboard in Arlington, Texas

$2.91 – $9.71

per sq ft

Prices in Arlington are 5.0% lower than the national average for pegboard.

National average: $3 – $10 per sq ft

What you get at each price level

  • Basic

    $2.47 – $8.25 per sq ft

    1/4 in. tempered hardboard pegboard in natural brown on 1x2 furring strips screwed into studs

    Rendering: BuildX

    Find a pro to do this
  • Premium

    $3.64 – $12 per sq ft

    Powder-coated steel pegboard panels on spacers into studs, higher load capacity, finished edges

    Rendering: BuildX

    Find a pro to do this

Cost Breakdown in Arlington

ComponentCategoryPrice RangeUnit
Materialsmaterial$1.41 – $4.67sq ft
Laborlabor$0.90 – $2.98sq ft
Supplies & Othersupplies$0.36 – $1.19sq ft
Equipment & Disposalequipment$0.24 – $0.87sq ft
Prices adjusted for Arlington local market conditions.

Pegboard photo examples

Cost Factors in Arlington, Texas

What Affects Pricing

  • Materials ($1.37-$4.53 per square foot)
  • Labor ($1.05-$3.47 per square foot)
  • Supplies & Other ($0.35-$1.16 per square foot)
  • Equipment & Disposal ($0.23-$0.84 per square foot)

Local Price Adjustments

Material costs3.0% above avg
Labor costs14.0% below avg

Material costs in Arlington run proportionally higher than labor, which may favor labor-intensive approaches.

Frequently Asked Questions

References

Get Free Estimates in Arlington

Connect with local pegboard contractors in Arlington for personalized quotes based on your specific project.

More Cost Intelligence for Arlington