Basic
$8,521 – $20,451 per project
Condensing gas boiler near 92% AFUE, two zones, fin-tube baseboard with standard steel covers, new supply and return piping
Whole-house hydronic heat: new boiler plus baseboard or radiators for a typical 1,500-2,500 sq ft home, installed.
Hydronic Heating System in Baltimore, Maryland typically costs $10,025 to $24,060 per project as of 2026. Prices reflect local labor and material rates. Use our calculator below for a detailed, ZIP-code-adjusted estimate.
Prices in Baltimore are in line with the national average for hydronic heating system.
National average: $10,000 – $24,000 per project
$8,521 – $20,451 per project
Condensing gas boiler near 92% AFUE, two zones, fin-tube baseboard with standard steel covers, new supply and return piping
$10,025 – $24,060 per project
Condensing gas boiler near 95% AFUE with outdoor reset, two zones, fin-tube baseboard with sturdier covers, new piping
$12,531 – $30,075 per project
Fully modulating condensing boiler near 96% AFUE, outdoor reset, two zones, ECM circulators, heavy-gauge baseboard covers
| Component | Category | Price Range | Unit |
|---|---|---|---|
| Materials | material | $4,590 – $11,016 | job |
| Labor | labor | $3,395 – $8,148 | job |
| Supplies & Other | supplies | $1,224 – $2,938 | job |
| Equipment & Disposal | equipment | $816 – $1,958 | job |
Material costs in Baltimore run proportionally higher than labor, which may favor labor-intensive approaches.
Connect with local hydronic heating system contractors in Baltimore for personalized quotes based on your specific project.