Skip to main content
BuildX Pro

How Much Does Install Electric Water Heater Cost in Billings, Montana?

Supply and install a 40-50 gal electric tank water heater replacing an existing unit (unit, labor, connections, haul-away); new 240V circuit or panel work extra.

Install Electric Water Heater in Billings, Montana typically costs $877 to $2,143 per project as of 2026. Prices reflect local labor and material rates. Use our calculator below for a detailed, ZIP-code-adjusted estimate.

Install Electric Water Heater in Billings, Montana

$877 – $2,143

per project

Prices in Billings are 2.0% lower than the national average for install electric water heater.

National average: $900 – $2,200 per project

What you get at each price level

  • Basic

    $745 – $1,821 per project

    50 gallon electric tank, 6-year tank class, dual elements, new water connectors, drain pan where required, relief line, old unit hauled away

  • Standard

    $877 – $2,143 per project

    50 gallon electric tank, 9-year tank class, new flex water connectors and shutoff, drain pan where required, relief line

  • Premium

    $1,096 – $2,679 per project

    50 gallon electric tank, 12-year tank class, new connectors and shutoff, drain pan, thermal expansion tank, relief line

Cost Breakdown in Billings

ComponentCategoryPrice RangeUnit
Materialsmaterial$389 – $950job
Laborlabor$315 – $770job
Supplies & Othersupplies$104 – $253job
Equipment & Disposalequipment$69 – $169job
Prices adjusted for Billings local market conditions.

Cost Factors in Billings, Montana

What Affects Pricing

  • Materials ($405.00-$990.00 per project)
  • Labor ($315.00-$770.00 per project)
  • Supplies & Other ($108.00-$264.00 per project)
  • Equipment & Disposal ($72.00-$176.00 per project)

Local Price Adjustments

Material costs4.0% below avg
Labor costsAt national average

Frequently Asked Questions

References

Get Free Estimates in Billings

Connect with local install electric water heater contractors in Billings for personalized quotes based on your specific project.

More Cost Intelligence for Billings