Skip to main content
BuildX Pro
Install Landscape Curbing cost in Billings

How Much Does Install Landscape Curbing Cost in Billings, Montana?

Machine-extruded poured concrete landscape curbing along beds or lawn edges, standard or lightly stamped/colored profile.

Install Landscape Curbing in Billings, Montana typically costs $7.79 to $19 per linear ft as of 2026. Prices reflect local labor and material rates. Use our calculator below for a detailed, ZIP-code-adjusted estimate.

Install Landscape Curbing in Billings, Montana

$7.79 – $19

per linear ft

Prices in Billings are 2.0% lower than the national average for install landscape curbing.

National average: $8 – $20 per linear ft

What you get at each price level

  • Basic

    $6.62 – $17 per linear ft

    Plain gray machine-extruded concrete mower-edge curb, smooth finish, control joints cut every few feet

  • Standard

    $7.79 – $19 per linear ft

    Integrally colored machine-extruded mower-edge curb, control joints, cure-and-seal applied

  • Premium

    $9.74 – $24 per linear ft

    Integrally colored extruded mower-edge curb lightly stamped in a stone pattern with release color accent, control joints, sealed

Cost Breakdown in Billings

ComponentCategoryPrice RangeUnit
Materialsmaterial$3.46 – $8.64linear ft
Laborlabor$2.80 – $7linear ft
Supplies & Othersupplies$0.92 – $2.30linear ft
Equipment & Disposalequipment$0.61 – $1.54linear ft
Prices adjusted for Billings local market conditions.

Install Landscape Curbing photo examples

Cost Factors in Billings, Montana

What Affects Pricing

  • Materials ($3.60-$9.00 per linear foot)
  • Labor ($2.80-$7.00 per linear foot)
  • Supplies & Other ($0.96-$2.40 per linear foot)
  • Equipment & Disposal ($0.64-$1.60 per linear foot)

Local Price Adjustments

Material costs4.0% below avg
Labor costsAt national average

Frequently Asked Questions

References

Get Free Estimates in Billings

Connect with local install landscape curbing contractors in Billings for personalized quotes based on your specific project.

More Cost Intelligence for Billings