Skip to main content
BuildX Pro
A kitchen with the countertop run removed leaving base cabinets with open drawers beneath a window.

How Much Does Remove Kitchen Countertop Cost in Billings, Montana?

Detach and remove an existing kitchen countertop run (about 25-40 sq ft, laminate or stone) from the cabinets and haul away the debris.

Remove Kitchen Countertop in Billings, Montana typically costs $146 to $438 per project as of 2026. Prices reflect local labor and material rates. Use our calculator below for a detailed, ZIP-code-adjusted estimate.

Remove Kitchen Countertop in Billings, Montana

$146 – $438

per project

Prices in Billings are 2.0% lower than the national average for remove kitchen countertop.

National average: $150 – $450 per project

What you get at each price level

  • Basic

    $124 – $373 per project

    Countertop run detached from the cabinets with a pry bar, broken down and hauled away

  • Standard

    $146 – $438 per project

    Countertop cut free of caulk and adhesive and lifted off in sections, cabinet tops protected, debris hauled

  • Premium

    $183 – $548 per project

    Countertop cut into sections with dust control where needed, cabinet tops cleared of screws and adhesive, floors and walls protected, hauled

Cost Breakdown in Billings

ComponentCategoryPrice RangeUnit
Materialsmaterial$65 – $194job
Laborlabor$53 – $158job
Supplies & Othersupplies$17 – $52job
Equipment & Disposalequipment$11 – $35job
Prices adjusted for Billings local market conditions.

Cost Factors in Billings, Montana

What Affects Pricing

  • Materials ($67.65-$202.50 per project)
  • Labor ($52.94-$157.50 per project)
  • Supplies & Other ($17.65-$54.00 per project)
  • Equipment & Disposal ($11.76-$36.00 per project)

Local Price Adjustments

Material costs4.0% below avg
Labor costsAt national average

Frequently Asked Questions

References

Get Free Estimates in Billings

Connect with local remove kitchen countertop contractors in Billings for personalized quotes based on your specific project.

More Cost Intelligence for Billings