Skip to main content
BuildX Pro
Rendering: Bluestone Step at the Premium level: 2 in. select blue thermal tread with a bullnose front edge, mortar-set level with a slight overhang

Rendering: BuildX

How Much Does Bluestone Step Cost in Boise, Idaho?

One natural bluestone step: tread set on a prepared base or riser, per step installed.

Bluestone Step in Boise, Idaho typically costs $236 to $613 each as of 2026. Prices reflect local labor and material rates. Use our calculator below for a detailed, ZIP-code-adjusted estimate.

Bluestone Step in Boise, Idaho

$236 – $613

each

Prices in Boise are 6.0% lower than the national average for bluestone step.

National average: $250 – $650 each

What you get at each price level

  • Basic

    $200 – $521 each

    Natural-cleft bluestone tread 2 in. thick with rough-split edges, set level in a mortar bed on the riser

    Rendering: BuildX

    Find a pro to do this
  • Standard

    $236 – $613 each

    2 in. thermal-finish bluestone tread with sawn edges, set level in mortar on the riser

    Rendering: BuildX

    Find a pro to do this
  • Premium

    $295 – $766 each

    2 in. select blue thermal tread with a bullnose front edge, mortar-set level with a slight overhang

    Rendering: BuildX

    Find a pro to do this

Cost Breakdown in Boise

ComponentCategoryPrice RangeUnit
Materialsmaterial$108 – $281each
Laborlabor$80 – $207each
Supplies & Othersupplies$29 – $75each
Equipment & Disposalequipment$19 – $50each
Prices adjusted for Boise local market conditions.

Bluestone Step photo examples

Cost Factors in Boise, Idaho

What Affects Pricing

  • Materials ($112.00-$293.00 per unit)
  • Labor ($88.00-$227.00 per unit)
  • Supplies & Other ($30.00-$78.00 per unit)
  • Equipment & Disposal ($20.00-$52.00 per unit)

Local Price Adjustments

Material costs4.0% below avg
Labor costs9.0% below avg

Frequently Asked Questions

References

Get Free Estimates in Boise

Connect with local bluestone step contractors in Boise for personalized quotes based on your specific project.

More Cost Intelligence for Boise