Skip to main content
BuildX Pro
Refinish Front Door cost in Boston

How Much Does Refinish Front Door Cost in Boston, Massachusetts?

Refinish one exterior wood front door: strip/sand to bare wood, stain, and multiple UV-resistant clear coats, door removed and rehung.

Refinish Front Door in Boston, Massachusetts typically costs $383 to $1,095 each as of 2026. Prices reflect local labor and material rates. Use our calculator below for a detailed, ZIP-code-adjusted estimate.

Refinish Front Door in Boston, Massachusetts

$383 – $1,095

each

Prices in Boston are 14.0% higher than the national average for refinish front door.

National average: $350 – $1,000 each

What you get at each price level

  • Basic

    $325 – $930 each

    Stripped and sanded to bare wood, one coat of exterior stain, three coats of UV-resistant spar varnish, door rehung

  • Standard

    $383 – $1,095 each

    Stripped and sanded, stain, four coats of UV-resistant spar urethane sanded between coats, all edges sealed, rehung

  • Premium

    $479 – $1,368 each

    Stripped and hand-sanded, wood conditioner, matched stain, five coats of UV-blocking marine varnish, all edges sealed, rehung

Cost Breakdown in Boston

ComponentCategoryPrice RangeUnit
Materialsmaterial$158 – $450each
Laborlabor$155 – $445each
Supplies & Othersupplies$42 – $120each
Equipment & Disposalequipment$28 – $80each
Prices adjusted for Boston local market conditions.

Refinish Front Door photo examples

Cost Factors in Boston, Massachusetts

What Affects Pricing

  • Materials ($158.00-$450.00 per unit)
  • Labor ($122.00-$350.00 per unit)
  • Supplies & Other ($42.00-$120.00 per unit)
  • Equipment & Disposal ($28.00-$80.00 per unit)

Local Price Adjustments

Material costsAt national average
Labor costs27.0% above avg

Labor costs in Boston run proportionally higher than materials, which may favor material-heavy solutions.

Frequently Asked Questions

References

Get Free Estimates in Boston

Connect with local refinish front door contractors in Boston for personalized quotes based on your specific project.

More Cost Intelligence for Boston