Basic
$22 – $66 per sq ft
Rounded fieldstone dry-stacked with wide joints and chinking stones on a compacted gravel base, slight batter

Photo: Chris Light · CC BY-SA 4.0 · Source
Build a fieldstone wall (dry-stacked or mortared, including gravel base) - materials and mason labor per sq ft of wall face; caps, drainage and permits extra.
Fieldstone Wall in Bridgeport, Connecticut typically costs $26 to $77 per sq ft as of 2026. Prices reflect local labor and material rates. Use our calculator below for a detailed, ZIP-code-adjusted estimate.
Prices in Bridgeport are 6.0% higher than the national average for fieldstone wall.
National average: $25 – $75 per sq ft
$22 – $66 per sq ft
Rounded fieldstone dry-stacked with wide joints and chinking stones on a compacted gravel base, slight batter
$26 – $77 per sq ft
Fieldstone selected for flatter beds, dry-stacked with tighter joints and tie stones on a compacted gravel base
$32 – $97 per sq ft
Hand-selected flat-bedded fieldstone laid in roughly level courses with tight fitting, through-stones and batter, gravel base
| Component | Category | Price Range | Unit |
|---|---|---|---|
| Materials | material | $11 – $33 | sq ft |
| Labor | labor | $9.98 – $30 | sq ft |
| Supplies & Other | supplies | $2.91 – $8.73 | sq ft |
| Equipment & Disposal | equipment | $1.94 – $5.82 | sq ft |
Rounded boulder fieldstone wall with a mulched planting bed in front
Photo: Chris Light · CC BY-SA 4.0 · Source
Find a pro to do thisClose-up of a fieldstone wall made of large grey irregular stones
Photo: onnola · CC BY-SA 2.0 · Source
Find a pro to do thisLabor costs in Bridgeport run proportionally higher than materials, which may favor material-heavy solutions.
Connect with local fieldstone wall contractors in Bridgeport for personalized quotes based on your specific project.