Basic
$66 – $175 each
Water shut off, toilet disconnected and pulled, flange plugged with a test plug, toilet hauled away

Shut off and disconnect a toilet, pull it and the wax ring, cap or plug the flange and haul the old fixture away; new toilet not included.
Remove Toilet in Bridgeport, Connecticut typically costs $77 to $206 each as of 2026. Prices reflect local labor and material rates. Use our calculator below for a detailed, ZIP-code-adjusted estimate.
Prices in Bridgeport are 6.0% higher than the national average for remove toilet.
National average: $75 – $200 each
$66 – $175 each
Water shut off, toilet disconnected and pulled, flange plugged with a test plug, toilet hauled away
$77 – $206 each
Toilet pulled, old wax scraped from the flange, flange plugged, supply stop capped, toilet hauled
$96 – $257 each
Toilet pulled, wax and closet bolts removed, flange checked and condition noted, flange plugged, floor cleaned, hauled
| Component | Category | Price Range | Unit |
|---|---|---|---|
| Materials | material | $33 – $87 | each |
| Labor | labor | $30 – $80 | each |
| Supplies & Other | supplies | $8.73 – $23 | each |
| Equipment & Disposal | equipment | $5.82 – $16 | each |
Old white toilet bowls removed from a building and piled in a dumpster
Photo: Kotivalo · CC BY-SA 4.0 · Source
Find a pro to do thisOpen toilet flange in the floor after the toilet and wax ring were removed
Photo: plumberx1@gmail.com · CC BY 2.0 · Source
Find a pro to do thisLabor costs in Bridgeport run proportionally higher than materials, which may favor material-heavy solutions.
Connect with local remove toilet contractors in Bridgeport for personalized quotes based on your specific project.