Skip to main content
BuildX Pro

How Much Does Heat Recovery Ventilation System Cost in Burlington, Vermont?

Install a ducted whole-house heat recovery ventilator (HRV) with dedicated supply/exhaust ducting and controls in an existing home.

Heat Recovery Ventilation System in Burlington, Vermont typically costs $1,954 to $5,862 per project as of 2026. Prices reflect local labor and material rates. Use our calculator below for a detailed, ZIP-code-adjusted estimate.

Heat Recovery Ventilation System in Burlington, Vermont

$1,954 – $5,862

per project

Prices in Burlington are 2.0% lower than the national average for heat recovery ventilation system.

National average: $2,000 – $6,000 per project

What you get at each price level

  • Basic

    $1,661 – $4,983 per project

    Compact HRV with standard heat recovery core and low/high wall control, insulated ducts to exterior hoods, airflow balanced

  • Standard

    $1,954 – $5,862 per project

    Mid-size HRV with ECM fans and higher-recovery core, dedicated supply and exhaust ducts, timer controls, flow-balanced

  • Premium

    $2,443 – $7,328 per project

    High-efficiency HRV with ECM fans and high-recovery core, defrost control, humidity sensing and measured balancing

Cost Breakdown in Burlington

ComponentCategoryPrice RangeUnit
Materialsmaterial$873 – $2,619job
Laborlabor$693 – $2,079job
Supplies & Othersupplies$233 – $698job
Equipment & Disposalequipment$155 – $466job
Prices adjusted for Burlington local market conditions.

Cost Factors in Burlington, Vermont

What Affects Pricing

  • Materials ($900.00-$2,700.00 per project)
  • Labor ($700.00-$2,100.00 per project)
  • Supplies & Other ($240.00-$720.00 per project)
  • Equipment & Disposal ($160.00-$480.00 per project)

Local Price Adjustments

Material costs3.0% below avg
Labor costs1.0% below avg

Frequently Asked Questions

References

Get Free Estimates in Burlington

Connect with local heat recovery ventilation system contractors in Burlington for personalized quotes based on your specific project.

More Cost Intelligence for Burlington