Skip to main content
BuildX
Rendering: Kitchen Cabinet Refacing at the Premium level: Solid cherry raised-panel doors and drawer fronts, matching veneer on frames, factory stain, soft-close hinges

Rendering: BuildX

How Much Does Kitchen Cabinet Refacing Cost in Burlington, Vermont?

Kitchen Cabinet Refacing: national installed price range, materials and labor breakdown, and local pricing by ZIP code.

Kitchen Cabinet Refacing in Burlington, Vermont typically costs $3,908 to $11,724 per project as of 2026. Prices reflect local labor and material rates. Use our calculator below for a detailed, ZIP-code-adjusted estimate.

Kitchen Cabinet Refacing in Burlington, Vermont

$3,908 – $11,724

per project

Prices in Burlington are 2.0% lower than the national average for kitchen cabinet refacing.

National average: $4,000 – $12,000 per project

What you get at each price level

  • Rendering: Kitchen Cabinet Refacing at the Basic level: Thermofoil shaker doors and drawer fronts, matching laminate on face frames, new hinges and pulls

    Basic

    $3,322 – $9,965 per project

    Thermofoil shaker doors and drawer fronts, matching laminate on face frames, new hinges and pulls

    Rendering: BuildX

  • Rendering: Kitchen Cabinet Refacing at the Standard level: Real-wood veneer on frames with wood shaker doors and drawer fronts, factory finish, soft-close hinges, new pulls

    Standard

    $3,908 – $11,724 per project

    Real-wood veneer on frames with wood shaker doors and drawer fronts, factory finish, soft-close hinges, new pulls

    Rendering: BuildX

  • Rendering: Kitchen Cabinet Refacing at the Premium level: Solid cherry raised-panel doors and drawer fronts, matching veneer on frames, factory stain, soft-close hinges

    Premium

    $4,885 – $14,655 per project

    Solid cherry raised-panel doors and drawer fronts, matching veneer on frames, factory stain, soft-close hinges

    Rendering: BuildX

Cost Breakdown in Burlington

ComponentCategoryPrice RangeUnit
Materialsmaterial$1,746 – $5,238job
Laborlabor$1,386 – $4,158job
Supplies & Othersupplies$466 – $1,397job
Equipment & Disposalequipment$310 – $931job
Prices adjusted for Burlington local market conditions.

Kitchen Cabinet Refacing photo examples

Cost Factors in Burlington, Vermont

What Affects Pricing

  • Materials ($1,800.00-$5,400.00 per project)
  • Labor ($1,400.00-$4,200.00 per project)
  • Supplies & Other ($480.00-$1,440.00 per project)
  • Equipment & Disposal ($320.00-$960.00 per project)

Local Price Adjustments

Material costs3.0% below avg
Labor costs1.0% below avg

Frequently Asked Questions

References

Get Free Estimates in Burlington

Connect with local kitchen cabinet refacing contractors in Burlington for personalized quotes based on your specific project.

More Cost Intelligence for Burlington