Skip to main content
BuildX Pro
Rendering: Bathroom Stall at the Premium level: Solid HDPE plastic panels and door, floor-anchored and overhead-braced, stainless continuous hinge and heavy-duty latch

Rendering: BuildX

How Much Does Bathroom Stall Cost in Columbus, Ohio?

Supply and install one commercial toilet partition compartment (panels, door, pilasters, hardware) in powder-coated steel, laminate or HDPE.

Bathroom Stall in Columbus, Ohio typically costs $887 to $2,168 each as of 2026. Prices reflect local labor and material rates. Use our calculator below for a detailed, ZIP-code-adjusted estimate.

Bathroom Stall in Columbus, Ohio

$887 – $2,168

each

Prices in Columbus are in line with the national average for bathroom stall.

National average: $900 – $2,200 each

What you get at each price level

  • Standard

    $887 – $2,168 each

    Plastic laminate panels and door on particleboard core, overhead-braced, stainless steel hardware

    Rendering: BuildX

    Find a pro to do this
  • Premium

    $1,109 – $2,710 each

    Solid HDPE plastic panels and door, floor-anchored and overhead-braced, stainless continuous hinge and heavy-duty latch

    Rendering: BuildX

    Find a pro to do this

Cost Breakdown in Columbus

ComponentCategoryPrice RangeUnit
Materialsmaterial$381 – $931each
Laborlabor$337 – $824each
Supplies & Othersupplies$102 – $248each
Equipment & Disposalequipment$68 – $165each
Prices adjusted for Columbus local market conditions.

Cost Factors in Columbus, Ohio

What Affects Pricing

  • Materials ($405.00-$990.00 per unit)
  • Labor ($315.00-$770.00 per unit)
  • Supplies & Other ($108.00-$264.00 per unit)
  • Equipment & Disposal ($72.00-$176.00 per unit)

Local Price Adjustments

Material costs6.0% below avg
Labor costs7.0% above avg

Labor costs in Columbus run proportionally higher than materials, which may favor material-heavy solutions.

Frequently Asked Questions

References

Get Free Estimates in Columbus

Connect with local bathroom stall contractors in Columbus for personalized quotes based on your specific project.

More Cost Intelligence for Columbus