Skip to main content
BuildX Pro

How Much Does High Efficiency Gas Furnace Cost in Columbus, Ohio?

Replace a gas furnace with a 95-98% AFUE condensing unit including PVC venting, condensate drain and connection to existing ducts.

High Efficiency Gas Furnace in Columbus, Ohio typically costs $4,435 to $8,870 each as of 2026. Prices reflect local labor and material rates. Use our calculator below for a detailed, ZIP-code-adjusted estimate.

High Efficiency Gas Furnace in Columbus, Ohio

$4,435 – $8,870

each

Prices in Columbus are in line with the national average for high efficiency gas furnace.

National average: $4,500 – $9,000 each

What you get at each price level

  • Basic

    $3,770 – $7,539 each

    95-96% AFUE single-stage condensing gas furnace with ECM blower, PVC venting, condensate drain, new thermostat

  • Standard

    $4,435 – $8,870 each

    96-97% AFUE two-stage condensing gas furnace with variable-speed blower, PVC venting, condensate trap and neutralizer

  • Premium

    $5,543 – $11,087 each

    97-98% AFUE modulating condensing gas furnace with variable-speed blower, communicating thermostat, concentric vent kit

Cost Breakdown in Columbus

ComponentCategoryPrice RangeUnit
Materialsmaterial$1,904 – $3,807each
Laborlabor$1,685 – $3,371each
Supplies & Othersupplies$508 – $1,015each
Equipment & Disposalequipment$338 – $677each
Prices adjusted for Columbus local market conditions.

Cost Factors in Columbus, Ohio

What Affects Pricing

  • Materials ($2,025.00-$4,050.00 per unit)
  • Labor ($1,575.00-$3,150.00 per unit)
  • Supplies & Other ($540.00-$1,080.00 per unit)
  • Equipment & Disposal ($360.00-$720.00 per unit)

Local Price Adjustments

Material costs6.0% below avg
Labor costs7.0% above avg

Labor costs in Columbus run proportionally higher than materials, which may favor material-heavy solutions.

Frequently Asked Questions

References

Get Free Estimates in Columbus

Connect with local high efficiency gas furnace contractors in Columbus for personalized quotes based on your specific project.

More Cost Intelligence for Columbus