Skip to main content
BuildX Pro

How Much Does Reglaze Tile Cost in Des Moines, Iowa?

On-site reglazing (refinishing) of existing ceramic wall or floor tile: clean, repair grout, etch, prime and spray coating.

Reglaze Tile in Des Moines, Iowa typically costs $3.84 to $12 per sq ft as of 2026. Prices reflect local labor and material rates. Use our calculator below for a detailed, ZIP-code-adjusted estimate.

Reglaze Tile in Des Moines, Iowa

$3.84 – $12

per sq ft

Prices in Des Moines are 3.0% lower than the national average for reglaze tile.

National average: $4 – $12 per sq ft

What you get at each price level

  • Basic

    $3.27 – $9.80 per sq ft

    Clean and etch, cracked grout spot-repaired, bonding primer, two sprayed coats of acrylic urethane in white, slip additive on floors

  • Standard

    $3.84 – $12 per sq ft

    Deep clean and mildew removal, grout repaired, etch, bonding primer, three sprayed coats of polyurethane, slip additive on floors

  • Premium

    $4.81 – $14 per sq ft

    Deep clean, grout and chip repairs, bonding primer, three coats of aliphatic polyurethane, clear topcoat, slip additive on floors

Cost Breakdown in Des Moines

ComponentCategoryPrice RangeUnit
Materialsmaterial$1.69 – $5.08sq ft
Laborlabor$1.40 – $4.20sq ft
Supplies & Othersupplies$0.45 – $1.35sq ft
Equipment & Disposalequipment$0.30 – $0.90sq ft
Prices adjusted for Des Moines local market conditions.

Cost Factors in Des Moines, Iowa

What Affects Pricing

  • Materials ($1.80-$5.40 per square foot)
  • Labor ($1.40-$4.20 per square foot)
  • Supplies & Other ($0.48-$1.44 per square foot)
  • Equipment & Disposal ($0.32-$0.96 per square foot)

Local Price Adjustments

Material costs6.0% below avg
Labor costsAt national average

Labor costs in Des Moines run proportionally higher than materials, which may favor material-heavy solutions.

Frequently Asked Questions

References

Get Free Estimates in Des Moines

Connect with local reglaze tile contractors in Des Moines for personalized quotes based on your specific project.

More Cost Intelligence for Des Moines