How Much Does Cedar Shake Roof Cost in Fargo, North Dakota?

Supply and install a hand-split or taper-sawn cedar shake roof over an existing deck, per square foot of roof, tear-off extra.

Cedar Shake Roof in Fargo, North Dakota typically costs $6.77 to $15 per sq ft as of 2026. Prices reflect local labor and material rates. Use our calculator below for a detailed, ZIP-code-adjusted estimate.

Cedar Shake Roof in Fargo, North Dakota

$6.77 – $15

per sq ft

Prices in Fargo are 3.0% lower than the national average for cedar shake roof.

National average: $7 – $15 per sq ft

What you get at each price level

  • Basic

    $5.75 – $12 per sq ft

    Number 2 grade 24 in. medium hand-split and resawn cedar shakes, felt interlay between courses, hot-dip galvanized nails, standard ridge

  • Standard

    $6.77 – $15 per sq ft

    Number 1 grade 24 in. medium hand-split shakes, felt interlay, stainless nails, ice barrier at eaves

  • Premium

    $8.46 – $18 per sq ft

    Number 1 heavy hand-split 24 in. shakes, fire-retardant treated, stainless fasteners, cedar hip and ridge

Cost Breakdown in Fargo

ComponentCategoryPrice RangeUnit
Materialsmaterial$3.02 – $6.48sq ft
Laborlabor$2.40 – $5.15sq ft
Supplies & Othersupplies$0.81 – $1.73sq ft
Equipment & Disposalequipment$0.54 – $1.15sq ft
Prices adjusted for Fargo local market conditions.

Cedar Shake Roof photo examples

Cost Factors in Fargo, North Dakota

What Affects Pricing

  • Materials ($3.15-$6.75 per square foot)
  • Labor ($2.45-$5.25 per square foot)
  • Supplies & Other ($0.84-$1.80 per square foot)
  • Equipment & Disposal ($0.56-$1.20 per square foot)

Local Price Adjustments

Material costs4.0% below avg
Labor costs2.0% below avg

Frequently Asked Questions

References

Get Free Estimates in Fargo

Connect with local cedar shake roof contractors in Fargo for personalized quotes based on your specific project.

More Cost Intelligence for Fargo