How Much Does Landscaping Boulder Cost in Indianapolis, Indiana?

Supply, deliver and set one feature landscape boulder of about 1 ton (24-36 in.), partly buried and backfilled; crane access, large multi-ton rocks and site grading extra.

Landscaping Boulder in Indianapolis, Indiana typically costs $291 to $874 each as of 2026. Prices reflect local labor and material rates. Use our calculator below for a detailed, ZIP-code-adjusted estimate.

Landscaping Boulder in Indianapolis, Indiana

$291 – $874

each

Prices in Indianapolis are 1.0% lower than the national average for landscaping boulder.

National average: $300 – $900 each

What you get at each price level

  • Basic

    $248 – $743 each

    About 1-ton local fieldstone boulder, set roughly one-third buried, backfilled and compacted

    Rendering: BuildX

    Find a pro to do this
  • Standard

    $291 – $874 each

    About 1-ton select granite boulder with good shape and color, set one-third buried, face to the view

    Rendering: BuildX

    Find a pro to do this
  • Premium

    $364 – $1,093 each

    About 1-ton weathered lichen-covered moss rock boulder on a compacted base, one-third buried, soil and mulch dressed around

    Rendering: BuildX

    Find a pro to do this

Cost Breakdown in Indianapolis

ComponentCategoryPrice RangeUnit
Materialsmaterial$127 – $381each
Laborlabor$108 – $324each
Supplies & Othersupplies$34 – $102each
Equipment & Disposalequipment$23 – $68each
Prices adjusted for Indianapolis local market conditions.

Landscaping Boulder photo examples

Cost Factors in Indianapolis, Indiana

What Affects Pricing

  • Materials ($135.00-$405.00 per unit)
  • Labor ($105.00-$315.00 per unit)
  • Supplies & Other ($36.00-$108.00 per unit)
  • Equipment & Disposal ($24.00-$72.00 per unit)

Local Price Adjustments

Material costs6.0% below avg
Labor costs3.0% above avg

Labor costs in Indianapolis run proportionally higher than materials, which may favor material-heavy solutions.

Frequently Asked Questions

References

Get Free Estimates in Indianapolis

Connect with local landscaping boulder contractors in Indianapolis for personalized quotes based on your specific project.

More Cost Intelligence for Indianapolis