Skip to main content
BuildX Pro
Plastic Decking cost in Jackson

How Much Does Plastic Decking Cost in Jackson, Mississippi?

Build a new deck surfaced with PVC/plastic deck boards, including framing, footings, fasteners and labor (railings and stairs extra).

Plastic Decking in Jackson, Mississippi typically costs $18 to $41 per sq ft as of 2026. Prices reflect local labor and material rates. Use our calculator below for a detailed, ZIP-code-adjusted estimate.

Plastic Decking in Jackson, Mississippi

$18 – $41

per sq ft

Prices in Jackson are 12.0% lower than the national average for plastic decking.

National average: $20 – $45 per sq ft

What you get at each price level

  • Basic

    $15 – $34 per sq ft

    Solid-color PVC deck boards with light embossed grain, treated joists at 16 in., concrete footings, color-plugged screws

  • Standard

    $18 – $41 per sq ft

    Cellular PVC boards with multi-tone wood grain, joists at 12 in. with joist tape, hidden fasteners

  • Premium

    $23 – $51 per sq ft

    Cellular PVC boards with deep streaked wood-look grain, joists at 12 in., joist tape, hidden fasteners

Cost Breakdown in Jackson

ComponentCategoryPrice RangeUnit
Materialsmaterial$8.64 – $19sq ft
Laborlabor$5.53 – $12sq ft
Supplies & Othersupplies$2.30 – $5.18sq ft
Equipment & Disposalequipment$1.54 – $3.46sq ft
Prices adjusted for Jackson local market conditions.

Plastic Decking photo examples

Cost Factors in Jackson, Mississippi

What Affects Pricing

  • Materials ($9.00-$20.25 per square foot)
  • Labor ($7.00-$15.75 per square foot)
  • Supplies & Other ($2.40-$5.40 per square foot)
  • Equipment & Disposal ($1.60-$3.60 per square foot)

Local Price Adjustments

Material costs4.0% below avg
Labor costs21.0% below avg

Material costs in Jackson run proportionally higher than labor, which may favor labor-intensive approaches.

Frequently Asked Questions

References

Get Free Estimates in Jackson

Connect with local plastic decking contractors in Jackson for personalized quotes based on your specific project.

More Cost Intelligence for Jackson