Basic
$719 – $1,758 each
Powder-coated steel panels, door and pilasters, overhead-braced, chrome-plated standard hardware
Photo: jasoneppink · CC BY 2.0 · Source
Find a pro to do this
Rendering: BuildX
Supply and install one commercial toilet partition compartment (panels, door, pilasters, hardware) in powder-coated steel, laminate or HDPE.
Bathroom Stall in Omaha, Nebraska typically costs $846 to $2,068 each as of 2026. Prices reflect local labor and material rates. Use our calculator below for a detailed, ZIP-code-adjusted estimate.
Prices in Omaha are 6.0% lower than the national average for bathroom stall.
National average: $900 – $2,200 each
$719 – $1,758 each
Powder-coated steel panels, door and pilasters, overhead-braced, chrome-plated standard hardware
Photo: jasoneppink · CC BY 2.0 · Source
Find a pro to do this$846 – $2,068 each
Plastic laminate panels and door on particleboard core, overhead-braced, stainless steel hardware
Rendering: BuildX
Find a pro to do this$1,058 – $2,585 each
Solid HDPE plastic panels and door, floor-anchored and overhead-braced, stainless continuous hinge and heavy-duty latch
Rendering: BuildX
Find a pro to do this| Component | Category | Price Range | Unit |
|---|---|---|---|
| Materials | material | $381 – $931 | each |
| Labor | labor | $296 – $724 | each |
| Supplies & Other | supplies | $102 – $248 | each |
| Equipment & Disposal | equipment | $68 – $165 | each |
Connect with local bathroom stall contractors in Omaha for personalized quotes based on your specific project.