Basic
$9,520 – $22,848 per project
Condensing gas boiler near 92% AFUE, two zones, fin-tube baseboard with standard steel covers, new supply and return piping
Whole-house hydronic heat: new boiler plus baseboard or radiators for a typical 1,500-2,500 sq ft home, installed.
Hydronic Heating System in Portland, Oregon typically costs $11,200 to $26,880 per project as of 2026. Prices reflect local labor and material rates. Use our calculator below for a detailed, ZIP-code-adjusted estimate.
Prices in Portland are 15.0% higher than the national average for hydronic heating system.
National average: $10,000 – $24,000 per project
$9,520 – $22,848 per project
Condensing gas boiler near 92% AFUE, two zones, fin-tube baseboard with standard steel covers, new supply and return piping
$11,200 – $26,880 per project
Condensing gas boiler near 95% AFUE with outdoor reset, two zones, fin-tube baseboard with sturdier covers, new piping
$14,000 – $33,600 per project
Fully modulating condensing boiler near 96% AFUE, outdoor reset, two zones, ECM circulators, heavy-gauge baseboard covers
| Component | Category | Price Range | Unit |
|---|---|---|---|
| Materials | material | $4,725 – $11,340 | job |
| Labor | labor | $4,375 – $10,500 | job |
| Supplies & Other | supplies | $1,260 – $3,024 | job |
| Equipment & Disposal | equipment | $840 – $2,016 | job |
Labor costs in Portland run proportionally higher than materials, which may favor material-heavy solutions.
Connect with local hydronic heating system contractors in Portland for personalized quotes based on your specific project.