Basic
$14 – $29 per linear ft
Single row of standard red clay brick laid flat end to end, set in compacted sand, tamped level

Install a brick border or soldier-course edging along beds or a path, set in sand or mortar, materials and labor.
Install Brick Edging in Portland, Oregon typically costs $17 to $34 per linear ft as of 2026. Prices reflect local labor and material rates. Use our calculator below for a detailed, ZIP-code-adjusted estimate.
Prices in Portland are 15.0% higher than the national average for install brick edging.
National average: $15 – $30 per linear ft
$14 – $29 per linear ft
Single row of standard red clay brick laid flat end to end, set in compacted sand, tamped level
$17 – $34 per linear ft
Soldier-course red clay paver brick set upright in compacted gravel and sand, backfilled and tamped on both sides
$21 – $42 per linear ft
Soldier-course clay paver brick set in a mortar bed on a small concrete footing, tooled mortar joints
| Component | Category | Price Range | Unit |
|---|---|---|---|
| Materials | material | $7.09 – $14 | linear ft |
| Labor | labor | $6.56 – $13 | linear ft |
| Supplies & Other | supplies | $1.89 – $3.78 | linear ft |
| Equipment & Disposal | equipment | $1.26 – $2.52 | linear ft |
Red brick edging course set along a concrete slab border
Photo: mydogivana · CC BY 2.0 · Source
Find a pro to do thisLabor costs in Portland run proportionally higher than materials, which may favor material-heavy solutions.
Connect with local install brick edging contractors in Portland for personalized quotes based on your specific project.