
How Much Does Glass Shower Door Panel Cost in Salt Lake City, Utah?
Supply and install one tempered-glass shower door or fixed glass panel (framed to frameless 3/8 in.) on an existing shower, glass plus hardware and labor.
Glass Shower Door Panel in Salt Lake City, Utah typically costs $524 to $1,525 each as of 2026. Prices reflect local labor and material rates. Use our calculator below for a detailed, ZIP-code-adjusted estimate.
Glass Shower Door Panel in Salt Lake City, Utah
$524 – $1,525
eachPrices in Salt Lake City are 5.0% lower than the national average for glass shower door panel.
National average: $550 – $1,600 each
Cost Breakdown in Salt Lake City
| Component | Category | Price Range | Unit |
|---|---|---|---|
| Materials | material | $237 – $698 | each |
| Labor | labor | $181 – $520 | each |
| Supplies & Other | supplies | $63 – $184 | each |
| Equipment & Disposal | equipment | $42 – $123 | each |
Prices adjusted for Salt Lake City local market conditions.
Cost Factors in Salt Lake City, Utah
What Affects Pricing
- Materials ($247.00-$727.00 per unit)
- Labor ($193.00-$553.00 per unit)
- Supplies & Other ($66.00-$192.00 per unit)
- Equipment & Disposal ($44.00-$128.00 per unit)
Local Price Adjustments
Material costs4.0% below avg
Labor costs6.0% below avg
Frequently Asked Questions
References
- Fixed & Single Glass Shower Panels, framelessshowerdoorsnow.com, retrieved Nov 2026
- Construction wages by metro and rural area, used for the labor adjustment by ZIP code, U.S. Bureau of Labor Statistics, Occupational Employment and Wage Statistics, May 2025
- Regional price parities for goods, used for the materials adjustment by ZIP code, U.S. Bureau of Economic Analysis, 2024
Get Free Estimates in Salt Lake City
Connect with local glass shower door panel contractors in Salt Lake City for personalized quotes based on your specific project.