Skip to main content
BuildX Pro
Storm Shutter cost in Seattle

How Much Does Storm Shutter Cost in Seattle, Washington?

Permanent storm shutters (accordion, panel tracks, roll-down) supplied and installed per sq ft of opening.

Storm Shutter in Seattle, Washington typically costs $17 to $46 per sq ft as of 2026. Prices reflect local labor and material rates. Use our calculator below for a detailed, ZIP-code-adjusted estimate.

Storm Shutter in Seattle, Washington

$17 – $46

per sq ft

Prices in Seattle are 19.0% higher than the national average for storm shutter.

National average: $15 – $40 per sq ft

What you get at each price level

  • Basic

    $15 – $39 per sq ft

    Corrugated galvanized steel storm panels with permanently mounted top and bottom tracks, wing-nut fastening

  • Standard

    $17 – $46 per sq ft

    Prefinished white corrugated aluminum storm panels with permanently mounted tracks and headers, wing-nut fastening

  • Premium

    $21 – $57 per sq ft

    Heavier-gauge prefinished aluminum storm panels in a color matched to the trim, permanent tracks with finished end caps, stainless wing nuts

Cost Breakdown in Seattle

ComponentCategoryPrice RangeUnit
Materialsmaterial$7.02 – $19sq ft
Laborlabor$7.04 – $19sq ft
Supplies & Othersupplies$1.87 – $4.99sq ft
Equipment & Disposalequipment$1.25 – $3.33sq ft
Prices adjusted for Seattle local market conditions.

Storm Shutter photo examples

Cost Factors in Seattle, Washington

What Affects Pricing

  • Materials ($6.75-$18.00 per square foot)
  • Labor ($5.25-$14.00 per square foot)
  • Supplies & Other ($1.80-$4.80 per square foot)
  • Equipment & Disposal ($1.20-$3.20 per square foot)

Local Price Adjustments

Material costs4.0% above avg
Labor costs34.0% above avg

Labor costs in Seattle run proportionally higher than materials, which may favor material-heavy solutions.

Frequently Asked Questions

References

Get Free Estimates in Seattle

Connect with local storm shutter contractors in Seattle for personalized quotes based on your specific project.

More Cost Intelligence for Seattle