Basic
$2,802 – $6,406 per project
80% AFUE single-stage gas furnace sized to the existing ducts, vented into the existing flue, new gas connection and shutoff, startup checked

Supply and install a natural-gas furnace (80-95% AFUE) replacing an existing unit on existing ducts, including venting and connection; duct or gas-line extensions extra.
Install Gas Furnace in Virginia Beach, Virginia typically costs $3,297 to $7,536 per project as of 2026. Prices reflect local labor and material rates. Use our calculator below for a detailed, ZIP-code-adjusted estimate.
Prices in Virginia Beach are 7.0% lower than the national average for install gas furnace.
National average: $3,500 – $8,000 per project
$2,802 – $6,406 per project
80% AFUE single-stage gas furnace sized to the existing ducts, vented into the existing flue, new gas connection and shutoff, startup checked
$3,297 – $7,536 per project
92% AFUE single-stage condensing gas furnace with PVC intake and exhaust venting, condensate drain, new gas connection, startup combustion check
$4,121 – $9,420 per project
95% AFUE two-stage condensing gas furnace with variable-speed blower, PVC venting, condensate drain, new thermostat wiring, full combustion test
| Component | Category | Price Range | Unit |
|---|---|---|---|
| Materials | material | $1,528 – $3,492 | job |
| Labor | labor | $1,090 – $2,492 | job |
| Supplies & Other | supplies | $407 – $931 | job |
| Equipment & Disposal | equipment | $272 – $621 | job |
Material costs in Virginia Beach run proportionally higher than labor, which may favor labor-intensive approaches.
Connect with local install gas furnace contractors in Virginia Beach for personalized quotes based on your specific project.