Skip to main content
BuildX Pro
Subway Tile Backsplash cost in Washington

How Much Does Subway Tile Backsplash Cost in Washington, District of Columbia?

Ceramic or porcelain subway tile kitchen backsplash installed in a straight or offset pattern with thinset, grout and outlet cuts, per square foot of backsplash.

Subway Tile Backsplash in Washington, District of Columbia typically costs $16 to $42 per sq ft as of 2026. Prices reflect local labor and material rates. Use our calculator below for a detailed, ZIP-code-adjusted estimate.

Subway Tile Backsplash in Washington, District of Columbia

$16 – $42

per sq ft

Prices in Washington are 5.0% higher than the national average for subway tile backsplash.

National average: $15 – $40 per sq ft

What you get at each price level

  • Basic

    $13 – $36 per sq ft

    Glossy white 3x6 in ceramic subway tile in an offset pattern, white grout, plain cut edges caulked at the counter

  • Standard

    $16 – $42 per sq ft

    3x6 in beveled ceramic subway tile, offset pattern, contrasting grout, bullnose edge trim

  • Premium

    $20 – $52 per sq ft

    3x12 in glazed porcelain subway tile in a herringbone pattern, slim metal edge trim

Cost Breakdown in Washington

ComponentCategoryPrice RangeUnit
Materialsmaterial$7.09 – $19sq ft
Laborlabor$5.46 – $15sq ft
Supplies & Othersupplies$1.89 – $5.04sq ft
Equipment & Disposalequipment$1.26 – $3.36sq ft
Prices adjusted for Washington local market conditions.

Design styles

See how subway tile backsplash looks in each style, with photos of real projects by working designers.

Washington style: Federal traditional and contemporary

Washington's row houses and Georgetown Federal buildings set a formal traditional baseline: symmetry, millwork, shutters and period detail. Renovations often keep the shell and insert a crisp contemporary kitchen or bath.

Work by Washington designers first, then the styles Washington draws from.

Built from

Cost Factors in Washington, District of Columbia

What Affects Pricing

  • Materials ($6.75-$18.00 per square foot)
  • Labor ($5.25-$14.00 per square foot)
  • Supplies & Other ($1.80-$4.80 per square foot)
  • Equipment & Disposal ($1.20-$3.20 per square foot)

Local Price Adjustments

Material costs5.0% above avg
Labor costs4.0% above avg

Frequently Asked Questions

References

Get Free Estimates in Washington

Connect with local subway tile backsplash contractors in Washington for personalized quotes based on your specific project.

More Cost Intelligence for Washington