Skip to main content
BuildX Pro
Refinished stained wood double front door with arched glass transom and lanterns.

Photo: Brian C Murray · CC BY-SA 4.0 · Source

How Much Does Refinish Door Cost in Washington, District of Columbia?

Strip or sand, stain and clear-coat both faces and edges of one standard wood door, hardware removed and replaced.

Refinish Door in Washington, District of Columbia typically costs $209 to $576 each as of 2026. Prices reflect local labor and material rates. Use our calculator below for a detailed, ZIP-code-adjusted estimate.

Refinish Door in Washington, District of Columbia

$209 – $576

each

Prices in Washington are 5.0% higher than the national average for refinish door.

National average: $200 – $550 each

What you get at each price level

  • Basic

    $178 – $489 each

    Sanded to bare wood on both faces and edges, one coat of stain, two coats of polyurethane, hardware removed and reinstalled

  • Standard

    $209 – $576 each

    Chemically stripped and sanded including panel profiles, stain, sanding sealer, two coats of satin polyurethane, hardware reinstalled

  • Premium

    $262 – $719 each

    Fully stripped and hand-sanded, wood conditioner, matched stain, sealer and three sprayed coats of clear finish, hardware cleaned

Cost Breakdown in Washington

ComponentCategoryPrice RangeUnit
Materialsmaterial$95 – $260each
Laborlabor$73 – $200each
Supplies & Othersupplies$25 – $69each
Equipment & Disposalequipment$17 – $46each
Prices adjusted for Washington local market conditions.

Refinish Door photo examples

Cost Factors in Washington, District of Columbia

What Affects Pricing

  • Materials ($90.00-$248.00 per unit)
  • Labor ($70.00-$192.00 per unit)
  • Supplies & Other ($24.00-$66.00 per unit)
  • Equipment & Disposal ($16.00-$44.00 per unit)

Local Price Adjustments

Material costs5.0% above avg
Labor costs4.0% above avg

Frequently Asked Questions

References

Get Free Estimates in Washington

Connect with local refinish door contractors in Washington for personalized quotes based on your specific project.

More Cost Intelligence for Washington