Set your budget and how much you hand off. See the fee, and what it buys.
A general contractor who hires and runs your subcontractors usually charges 10–20% of the construction cost, so $6,000–$12,000 on a $60,000 project. A construction manager who coordinates while you sign each sub charges less (we show 3–15%), and an advisor who only finds and vets subs bills about $75–$300 an hour.
A fixed-price (lump-sum) bid hides the fee inside one number. The contractor adds overhead and profit to each sub’s price and to materials; builders describe that margin as 10–20%. You know the total up front, and the contractor carries the risk of going over.
A cost-plus contract shows you every invoice and adds a fee on top, usually 10–20% of actual cost. You see everything, but you carry the risk of overruns, and a percentage fee grows when costs grow. Ask for a fixed fee or a cap.
A construction manager is paid a separate fee and you sign each subcontract yourself. You get more control and more paperwork.
More trades, an occupied house, inspections that must happen in order, and work behind walls all favor a general contractor. A one- or two-trade job you can schedule yourself usually doesn’t need one.
Usually 10–20% of the construction cost (This Old House; Bob Vila; SVN Builder). On a $60,000 project that is $6,000–$12,000. Small or complicated jobs land near the top; large, simple ones near the bottom.
The fee is what the contractor keeps for overhead and profit. Markup is how it gets charged in a fixed-price bid: added onto sub prices and materials, often 10–20% in total (Baldwin Builders). In a cost-plus contract the fee is a separate line on top of actual costs.
Fixed price gives you a known total when the drawings are complete. Cost-plus fits remodels with unknowns behind the walls, but you carry the overrun risk. If you choose cost-plus, ask for a fixed fee or a not-to-exceed cap.
Yes. Owner’s representatives and consultants do this for about $75–$300 an hour (Inventure Properties; Terrapin, 2026). We estimate 3–6 hours per trade. You then hire, pay and schedule each trade yourself.
Some do, especially on small or complicated jobs where the management work doesn’t shrink with the budget. Builders describe cost-plus fees of 15–20% (Baldwin Builders). If a quote is above 20%, ask what it covers.
Every price above comes from the sources below, checked Nov 2026. Where they disagree we show the wider range and say why. With the starting inputs and national prices, the estimate is $6,000–$12,000. The calculator above updates for your choices and ZIP code.
| Source | What we used | Checked |
|---|---|---|
| This Old HouseTips for Hiring a Home Renovation Team | A builder quoted: professional management adds 10%-20% to the job; subs and materials are 60%-70% of it | 2026-11-09 |
| Bob VilaHow Much Does It Cost to Build a House? | Hiring a general contractor accounts for 10%-20% of total project cost | 2026-11-09 |
| SVN BuilderFixed-Price vs Cost-Plus Contracts 2026 | Cost-plus fees typically 10%-20% of actual cost; small projects sit higher | 2026-11-09 |
| Baldwin BuildersUnderstanding Construction Contracts (Apr 2026) | Fixed-price bids carry a 10%-20% margin; cost-plus fees typically 15%-20% | 2026-11-09 |
| Inventure PropertiesHow Much Does an Owner’s Representative Cost? | Owner’s rep 1%-5% of budget (small projects at the high end); hourly about $75 (project staff) to $250+ (senior), some up to $350 | 2026-11-09 |
| Terrapin Construction GroupOwner’s Representative Cost in 2026 | Owner’s rep 1%-5% of construction cost; advisory work $150-$300 per hour | 2026-11-09 |
| BuildX ProOur bracket: construction manager fee | 3%-15% of construction costWe found no non-marketplace source for a residential construction manager fee. A construction manager does more than an owner’s rep (1%-5%, small jobs at the top) and carries less risk than a general contractor (10%-20%), so we show the span between them. | 2026-11-09 |
| BuildX ProOur assumption: hours to find and vet one trade | 3-6 hours per tradeNo source publishes hours per trade. We assume a call with each bidder, comparing 2-3 bids, and checking license, insurance and references. | 2026-11-09 |
| BuildX ProOur judgement: where you land inside the range | Typical point starts mid-range; +4 points of the range per trade over 4 (minus under 4), +10 under $25,000, -10 over $250,000, +5 over 26 weeks, +15 when a construction manager pulls the permit; kept between 15% and 85% of the rangeThese weights only move the typical number, never the range. Small jobs sit higher because management work does not shrink with the budget (SVN Builder; Inventure). | 2026-11-09 |
View local pricing for hire and manage subcontractors across 51 states.
Cost guides for property owners. Contractor ID for the shops who do the work.
Typical $9,000
Compared with the cheapest choice for each, all else the same.
| General contractor fee (overhead and profit)10–20% of $60,000. The typical number is our judgement: more trades, a budget under $25,000 or a job over 26 weeks move it up; a budget over $250,000 moves it down. | $6,000–$12,000 |
|---|
Prices checked Nov 2026 against 6 sources. Where these numbers come from
Your estimate ($6,000–$12,000) goes with the request, so pros start from the same numbers.